GWH19 - Demolition of Hawthorn Avenue
Estimated value
£75k
Awarded value
—
Suppliers
0
Lots
1
0 awarded
Published
13 May 2019
Deadline 30 May 2019
Description
The work comprises the demolition of 29no dwellings situated off Hawthorn Avenue, Hull. Dwellings are in blocks and are of a traditional brick build. It is assumed the properties are built on strip foundations, demolition is to include both the superstructure and sub structure down to a depth of 1 metre and include all pipework and drainage within the perimeter of the site. Post demolition the site will be backfilled with clean imported sub-soil to ground level. The existing boundary walls to the perimeter of 35 Stirling Street shall be re-built and newly exposed gable brickwork shall be repaired to ensure integrity is maintained.
Scope
- Reference
- HULLCC001-DN386568-03526538
- Total value
- £75,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 21 Jul 2019 to 05 Sept 2019
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 30 May 2019, 11:00 pm