Place 077 - Major Maintenance to Harrington Bridge Sawley
Estimated value
£700k
Awarded value
—
Suppliers
0
Lots
1
Published
02 Feb 2022
Description
The scheme involves major maintenance to the 60m long twin span Harrington Bridge which carries the B6540 over the major River Trent just south of Sawley Derbyshire. In brief the works include carriageway resurfacing, replacement of expansion joints, maintenance painting to the bridge elements, steelwork repairs / replacement to the bridge and central pier, installing a reinforced concrete leaf at the central pier, diving inspections and design of permanent structural elements (structural tie to the central pier). The works will include the Contractor to design both permanent and temporary works above and below the waterline. The Contractor is required to have specialist knowledge of working within an open river environment.
Scope
- Reference
- DERBSCC001-DN595683-61951077
- Total value
- £700,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 01 May 2022 to 12 Jun 2022
- CPV classifications
- 45221000 44212100 44212110 44212120
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 18 Mar 2022, 12:00 pm