CP2551-24 G5-3_DCC_036 - Dinan Way Extension
Estimated value
£7.7m
Awarded value
£7.7m
Suppliers
1
Lots
1
Published
19 Nov 2024
Description
This is a call off contract under the Generation 5 Civil Engineering, Highways and Transportation Infrastructure Works Framework 2024-2028 Lot 3. The scheme will consist of a 6.5m wide carriageway approximately 830m long from the junction of Dinan Way/Hulham Road to the A376 Exmouth Road. At each end of the proposed Dinan Way Extension the junction will take the form of a 3 and 4 arm compact roundabout. A new 2m wide shared pedestrian and cycle path along one side of the Dinan Way Extension will provide a facility for sustainable modes of transport from new developments and the northeast of Exmouth to access the Exe Estuary Trail. Two SUDS (consisting of filter drains, ditches and 5 ponds) will sustainably manage the surface water generated from the site and discharge into the Wotton Brook to the north. Various access points, maintenance bays and an agricultural crossing point are to be included.
Scope
- Reference
- DVNCC001-DN738440-04636940
- Total value
- £7,741,000.83 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 19 Nov 2024 to 19 Dec 2025
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 23 Oct 2024, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£7.7m
Award date
19 Nov 2024
Contract start
19 Nov 2024
Contract end
19 Dec 2025