Beck Hill Multi Storey Car Park, Bridlington East Yorkshire
Estimated value
£13.0m
Awarded value
—
Suppliers
0
Lots
1
Published
09 Jul 2024
Description
The Construction of a Multi Storey Car Park to the site at Beck Hill, the works are designed and will be issued under under NEC Option B for demolition works and enabling works followed by the construction of a multi-Storey Car Park. There will be associated civil engineering work in connection with the diversion of the existing Gypsey Race River in connection with the development. The overall scheme will provide 429 parking spaces comprising 392 standard parking bays and 31 accessible bays along with 6 Electrical Vehicle Charging Points. 8 motorcycle parking spaces and 12 cycle spaces will also be provided to the site. The scheme has been designed up to RIBA stage 4 however there may be a requirement for some element of contractor design development in connection with some of the smaller specialist elements of the works.
Scope
- Reference
- ocds-h6vhtk-046967
- Total value
- £13,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 45200000
- Contract locations
- Yorkshire and the Humber
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality Submission | 60 | quality | — |
| — | 40 | price | — |
Submission & procedure
- Submission deadline
- 26 Aug 2024, 11:00 am
- Submission address
- https://yortender.eu-supply.com/ ↗
- Procedure
- Open procedure