1-853 M60 Barton Bridge 2019/20

National HighwayscontractContracts FinderRef tender_141474/777899complete
View buyer

Estimated value

£17k

Awarded value

£170k

Awarded 19 Jun 2019

Suppliers

1

Lots

1

1 awarded

Published

20 Jun 2019

Deadline 15 Jun 2019

Description

Operations Directorate (OD) is seeking continued technical assistance and support in completing the steady state management of M60 Barton High Level Bridge (BHLB). BHLB has recently been assessed for 40t loading and its ability to be jacked under live load for the Category 3 spans. A number of steady state issues in its current condition have been identified during BHLB ongoing 40t assessment work that need to be rectified in order to safeguard the bridge's future and operation of the M60 in a planned way. The bridge is being managed under BD79, Management of Substandard Structures, procedures agreed with Safety Engineering and Standards Division on the understanding that concerns will be addressed through planned bridge bearing adjustment works. The issues of most concern were to have been addressed through the final year of the ASC 10 commission, which completed on 29th March 2019, but some work transferred into The AD 10 contract. Assessment work going forward in April 2019 will inform the newly appointed Asset Delivery Contract who will manage the future remedial and repair works to Barton Bridge and agree any longer-term monitoring strategy that may be preferred to expensive strengthening works. It will also ensure that the main canal spans are in a state of readiness to be jacked at short notice. This work will continue to address the assessment of the largest, Category 3 spans over the Manchester Ship Canal. AD 10 will use the outputs produced by Atkins, in conjunction with SES, to produce a design brief to instruct the Area 10 Design Services Contractor, Amey. Amey will produce a design to allow bearings supporting the canal span decks to be jacked and adjusted as required. The intention is to have this design completed before the end of the calendar year and before colder temperatures which may affect the expansion/contraction of the bridge. The duration of this work is expected to be from 20th May 2019 to 31st July 2020 and is being delivered in accordance with Specialist Professional and Technical Services Framework (SPATs Lot 1) requirements and this brief.

Scope

Reference
tender_141474/777899
Total value
£17,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
19 Jun 2019 to 30 Mar 2020
CPV classifications
73000000

Submission & procedure

Submission deadline
15 Jun 2019, 11:00 pm

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£170k

Award date

19 Jun 2019

Contract start

19 Jun 2019

Contract end

30 Mar 2020

Awarded to