Northumberland Energy Park (Phase 1)
Estimated value
£19.0m
Awarded value
—
Suppliers
0
Lots
1
Published
14 May 2018
Description
Further information will be provided in the Selection Questionnaire (SQ) and Invitation to Negotiate (ITN) documents however in summary, the scheme consists of, but is not limited to, Site clearance and removal of vegetation, topsoil and hardstanding Ground remediation as necessary, of the localised soils and groundwater's. Removal of relic structures Construction of a deep berth extension of the ash barge dock to allow vessels with a draft of up to 9.0m to use the berth Formation of a new piled quay wall on land, excavating existing soils between the new wall and existing wall and breaking out existing relic structures and finally removing the existing quay wall. Dredging with suitable batters formed between the dredge pockets and the tidal basin and a 10m wide open quay structure formed at the rear of the existing dock using tubular steel piles. Construction of a new open quay structure to the landward end of the existing ash barge dock.
Scope
- Reference
- ARCH001-DN339987-24676834
- Total value
- £19,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 18 Dec 2018 to 28 Jun 2020
- CPV classifications
- 45112330 45241100 45244000 45252124 71322000
Submission & procedure
- Submission deadline
- 14 Jun 2018, 11:00 pm