PCI_LotA_127 Blackwater Rail Strengthening
Estimated value
£17k
Awarded value
£17k
Suppliers
1
Lots
1
Published
06 Dec 2024
Description
A call-off from Lot A of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022). Blackwater Rail bridge has been assessed as substandard with respect to the service bay slab. The scope of this is to evaluate the existing assessments and feasibility study and decide, the most feasible option to strengthen the bridge. It should be noted that Trief kerbs are not desirable on this route. Upon deciding on most appropriate solution an AIP will be produced. The following items will be required: - Production of feasibility design, preliminary agreements and AIP documentation. Upon agreement of the AIP a further commission may be issued for detailed design.
Scope
- Reference
- UN25731
- Total value
- £17,191.17 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 25 Nov 2024 to 24 Apr 2025
- CPV classifications
- 71322300
Submission & procedure
- Submission deadline
- 27 Sept 2024, 1:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£17k
Award date
21 Nov 2024
Contract start
25 Nov 2024
Contract end
24 Apr 2025