1NextGen Electrolysis - Blending Equipment
Estimated value
—
Awarded value
—
Suppliers
0
Lots
2
Published
14 Oct 2025
Description
WWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process in non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the scope. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE a copy of which can be found in Appendix 1 in the scope. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.
Scope
- Reference
- WWU1440
- Commercial tool
- Standalone contract
- Contract dates
- 01 Jan 2025 to —
- Main category
- goods
- CPV classifications
- 3168221038420000388100003934100045333100
- Contract locations
- North East EnglandNorth West EnglandYorkshire and the HumberEast MidlandsWest MidlandsEast of EnglandLondonSouth East EnglandSouth West EnglandWales
Submission & procedure
- Procedure
- Restricted procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 2 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Lot 1 Equipment Supply only | — | cancelled |
| 2 | Equipment Supply & Install Complete | — | cancelled |