WP112.1 Permanent Walkways
Estimated value
£2.5m
Awarded value
—
Suppliers
0
Lots
1
Published
17 Oct 2023
Description
The works are located at Northolt Tunnels West (NTW) Northolt Tunnels East (NTE) and Euston Tunnels (ET). At each location a twin-bore tunnel will be constructed, forming two parallel tunnels, each containing a single rail track. SCS JV will construct 13 miles of twin-bore tunnels on the HS2 route using six TBMs, of which five will operate simultaneously. Approximately 42km of escape and maintenance walkway must be constructed throughout the length of the running tunnels. The emergency walkway shall run on the cross passage side and connect to it as well as to safe areas at portals, intervention points and shafts to provide a safe walking route. The maintenance walkway shall be installed on the opposite side to facilitate access for the inspection, maintenance and periodic component replacement operations necessary for train operation. The preferred construction methods for the tunnel walkways shall be either horizontal slip-forming system (slip-forming paver) or a system using mechanised shutter-based slip formwork.
Scope
- Reference
- C4N74777520
- Total value
- £2,500,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 03 Mar 2025 to 30 Apr 2028
- CPV classifications
- 45213316
Submission & procedure
- Submission deadline
- 30 Oct 2023, 4:00 pm