Stour Culvert (0182) Major Maintenance works 2020 (Re-waterproofing)
Estimated value
£80k
Awarded value
—
Suppliers
0
Lots
1
0 awarded
Published
06 Aug 2020
Deadline 04 Sept 2020
Description
Stour Culvert is an insitu reinforced concrete box structure. The culvert carries Stour Road over the Ellenor Brook watercourse. There is a single carriageway over the bridge for one lane of traffic in each direction. The works will comprise of excavation of road surfacing and fill material, removal of existing paving slabs, removal of existing waterproofing system to expose the concrete deck, preparation of concrete deck and application of new waterproofing system. This will be followed by reinstatement works including carriageway and footway surfacing, lining and kerbs where necessary.
Scope
- Reference
- WIGN001-DN491375-19004528
- Total value
- £80,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 13 Sept 2020 to 17 Oct 2020
- CPV classifications
- 45200000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 04 Sept 2020, 10:59 pm