GB-Bristol: Air Conditioning System Replacement and Auxiliary Works, Including a Servicing and Maintenance Phase - Bristol Office

View buyer

Estimated value

£500k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

17 Mar 2023

Deadline 11 Apr 2023

Description

NOTE: This notice was updated on 13 July 2023 for the following reason: This tender has not been awarded and withdrawn. We will review and reduce our requirement and issue an ITQ for the reduced workload.(The contract has two phases. The first phase is the design and installation of a replacement air conditioning system to our Bristol office. The second is maintenance and servicing of the newly installed system along with other mechanical and electrical infrastructure on site. The works are replacement of the air conditioning system at our Bristol office with a new VRV system. The existing chiller has failed multiple times and spare parts are getting difficult to source. It is therefore proposed to change the four-pipe unit with multiple VRV units covering the building in zones. The works include replacement of the existing air conditioning system and integration of the new system into the existing air handling unit (AHU). There is also a requirement to replacement the BMS system which is no longer supported by the existing manufacturers who has ceased trading. We expect the construction works to be delivered by 25th September 2023. We expect the works to be phased with the building in part occupation during the works. The servicing and maintenance, operational phase to commence at completion of the construction works and then continue yearly for 4 years with an option for a further two one year extensions. Full details are in the Scope.)

Scope

Reference
BIP769025061
Total value
£500,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
14 Jul 2023 to 29 Sept 2029
CPV classifications
45331000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
11 Apr 2023, 11:00 am