Portadown Flood Alleviation Scheme

View buyer

Estimated value

£60.0m

works

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

05 Sept 2025

This is a preliminary market engagement notice

Map the supplier landscape and document your shortlist before opening the tender. The market simulation produces a defensible audit record you can attach to your procurement file.

Run market simulation

Description

Portadown was identified as an Area of Potential Significant Flood Risk (APSFR) under the Northern Ireland Flood Risk Assessment. Portadown has been impacted by historical flooding on a regular basis over the last 30-40 years with significant flood events recorded during 1986, 1987, 2009, 2011, 2014, 2015/16 and 2023. The frequency and extent of flooding is predicted to increase with the effects of climate change. The Portadown Flood Alleviation Scheme (FAS) is a strategic project led by the Department for Infrastructure (DfI) Rivers in Northern Ireland. Its primary goal is to reduce the impact of fluvial flooding from the River Bann and its tributaries, particularly the Corcrain and Annagh Rivers, on residential and commercial properties in Portadown. The main objective is to reduce the impact of any potential fluvial flooding up to and including a 1% Annual Exceedance Probability (AEP) flood, with allowances for climate change as per current departmental guidance (20%). Portadown FAS consists of c.8km of flood defences on 21 sites around Portadown. The proposals include various piled flood defences (steel sheet, HZM, secant), concrete L walls, embankments, flood gates, demountable barriers, concrete culverts, headwalls, tie-ins to existing infrastructure, flap valves and property-level flood resilience measures. Additionally, the proposals will require temporary works design/management, drainage, reinstatement, elements of contractor design, environmental management and ecological surveys, adherence to the Environmental Impact Assessment and REAC, site clearance, landscaping, accommodation works, service diversion/alteration/protection, stakeholder and landowner engagement, health and safety management, community involvement and social value activities. It is proposed to phase the construction stage of Portadown FAS into 3 phases of approximately 2 years per phase. The intention is to invite Economic Operators to apply in an NEC Participation Stage process. Following this, a specified number of participants will be invited to tender for Phase 1 which will be awarded to one Economic Operator. All shortlisted Economic Operators successful at Tender Stage will be awarded onto a Framework for the duration of the construction phases and invited to tender for subsequent phases 2 & 3. Assessment will be based on price, quality and social value. Details of Phase 1 sites and draft Tender Stage documentation will be notified at Participation Stage. Subsequent Phase details will be notified to the Contractors awarded onto the Framework at Tender stage for Phase 2 and Phase 3.

Scope

Reference
Reference No 106982
Total value
£60,000,000 excluding VAT
£72,000,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
01 Nov 2026 to 01 Nov 2032
Main category
works
CPV classifications
45200000
45262211
45221111
Contract locations
Northern Ireland, United Kingdom

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Costcost60.00%
Qualityquality40.00%

Submission & procedure

Enquiry deadline
01 Nov 2025, 11:59 pm
Electronic submission
Yes
Procedure
Competitive flexible procedure