ROW Winterhay Farm Footbridge, Ilminster (1825)
Estimated value
£89k
Awarded value
£89k
Suppliers
1
Lots
1
Published
22 Aug 2024
Description
The footbridge currently present at this location is steel beamed with concrete block deck with timber handrails. In addition, a masonry abutment from a historic structure is present on the eastern bank. The footpath at this location is CH 14/11. These works are to include: • Provision of photographic condition survey of bridge area and proposed access routes. • Provision of current mid soffit height to invert. • Removal of existing abutments and reprofiling of southern bank to an approximately 45⁰ gradient. • Stabilise reprofiled surfaces of southern bank using natural materials (e.g., rock rolls below water level and biodegradable geotextile above). • Install new standard concrete pads. • Supply and install 1No. 15m span standard steel framed/timber clad footbridge. • Install steps either side of bridge with timber handrails. • Install gates at either end of bridge.
Scope
- Reference
- SOMRTD001-DN721001-74532876
- Total value
- £88,950 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 13 Aug 2024 to 01 Nov 2024
- CPV classifications
- 45221113
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 22 Jul 2024, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£89k
Award date
01 Aug 2024
Contract start
13 Aug 2024
Contract end
01 Nov 2024