Oban Pier Upgrades
Estimated value
—
Awarded value
£247k
Suppliers
1
Lots
1
Published
10 Dec 2025
Description
Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing The scope of works required are as follows: •Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required. •Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required. •Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required. •Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required. •Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required. •Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required. Potential replacement of galvanised steel ladders and access steps on a like for like basis will also be considered. We require the contractor to carry out the scope of works below: •Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location. •Provide a detailed tender submission of how they will carry out these upgrades •Full installation of the repairs and upgrades by the end March 2025. Timeline Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender – 28th August 2025 Mandatory site visit at Oban depot – proposed Monday 8th September 2025 Clarification deadline for suppliers – 16th September 2025 Tender return deadline – 25th September 2025 Tender Award – by 15th October 2025 Site mobilisation – 24th November 2025 Completion of project – By end March 2025 To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=1000322347
Scope
- Reference
- ENPR/PIER/2538
- Commercial tool
- Standalone contract
- Contract dates
- 14 Oct 2025 to 01 Apr 2026
- CPV classifications
- 03419100345160004524130045244000
- Contract locations
- Scotland, United Kingdom
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Bill of Quantities completion and Daywork/Standing rates | — | price | 35.00% |
| Technical and Capability completion | — | quality | 65.00% |
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£247k
Award date
07 Nov 2025
Contract start
05 Jan 2026
Contract end
31 Mar 2026