Loch na Obe Causeway Repair
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
26 May 2023
Description
An existing embankment causeway located on the A888 between Morghan and Northbay, Barra has recently collapsed at a section adjacent to the tidal bridge section. Overall condition of the causeway is poor and is regularly subject to flooding during high tidal events. Restraint barriers are also in poor condition and offer no appreciable restraint to vehicle strike. Proposal is to replace the existing approach embankments and culvert with a raised double track section of road and provide a new tidal culvert. The embankment shall be constructed from compacted rockfill with an armour stone outer surround with the new culvert constructed from pre-cast concrete culvert sections and wingwalls.
Scope
- Reference
- ocds-h6vhtk-03a206
- Commercial tool
- Standalone contract
- Contract dates
- 01 Mar 2023 to 30 Jun 2023
- Main category
- works
- CPV classifications
- 45000000
- Contract locations
- Scotland
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 40 | quality | — |
| — | 60 | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—