Solar Battery Storage
Estimated value
£40k
Awarded value
—
Suppliers
0
Lots
1
Published
13 Nov 2024
Description
Battery storage system to be connected to existing Solar panels and distribution board. Install no less than 60kWh battery with 3-phase 30kW AC coupled inverter. Wire 3-phase 63a supply from existing distribution board to new battery/inverter position. Install 3 no data cables from inverter position to incoming metre position for CT clamp to monitor electric usage. CT clamps to monitor existing PV system begins to export electricity to grid and switch to charge battery via App on our chosen platform device. Addition information below. External access to a store room adjoined to the existing building is where the battery will be located, this is about 2000mm from distribution board. Easy access for install. Some operating restrictions may apply due to building use. For further information please contact Phil Sutterby. psutterby@calne.gov.uk
Scope
- Reference
- Calne Town Council
- Total value
- £40,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 27 Jan 2025 to 30 Mar 2025
- CPV classifications
- 65300000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 18 Dec 2024, 5:00 pm