HRE - PJM/8 Clifton Hall Tunnel
Estimated value
£985k
Awarded value
£985k
Awarded 04 Jul 2024
Suppliers
1
Lots
1
1 awarded
Published
09 Jul 2024
Deadline 17 May 2024
Description
PJM/8 - Clifton Hall Tunnel, is situated in Swinton, Greater Manchester on the disused branch line that linked Patricroft with Molyneux Junction. The tunnel passes predominantly under residential housing and parkland aligned in a south-west to north-east direction. The double track tunnel, originally constructed in 1846, is 1187m long and lined with brick throughout. There are eight construction (blind) shafts along the length of the tunnel.
Scope
- Reference
- tender_418775/1374382
- Total value
- £985,109.52 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 21 Jul 2024 to 20 Dec 2024
- CPV classifications
- 50225000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 17 May 2024, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£985k
Award date
04 Jul 2024
Contract start
21 Jul 2024
Contract end
20 Dec 2024
Awarded to