Architect-led Multi-Disciplined Design Team for Guildhall Redevelopment Project
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
28 Jun 2024
Description
The Council intends to appoint an Architect Led Multi-Disciplined Team to lead a transformation project at the St George's Guildhall site in King's Lynn as part of the Towns Fund programme. The appointed team will be required to build on the existing RIBA Stage 1 work to take the St George's Guildhall Project from RIBA Stage 2 (Concept Design) to RIBA Stage 7 (Use), providing reports and ensuring Client approval at every stage. There will be a break clause after RIBA Stage 3 (Spatial Coordination) when a decision will be taken by the Council on the final project scope. The Appointed Team will include: - Architect / Lead Designer / Interior Designer / Fire Engineer / Principal Designer (CDM);- Structural Engineer;- Mechanical and Electrical Engineer;- Theatre Consultant;- Independent Access Advisor.
Scope
- Reference
- BCKLWN 252.1
- Commercial tool
- Standalone contract
- Contract dates
- 30 Mar 2023 to 28 Mar 2026
- Main category
- services
- Contract locations
- North and West Norfolk
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Outline Methodology to deliver the outputs of this appointment | 36 | quality | — |
| Details of proposed team including CV’s | 12 | quality | — |
| Details of 3 project relevant case studies | 12 | quality | — |
| Total Fixed Fee for RIBA Stages 2 and 3 | 17.5 | cost | — |
| Total Fixed Fee for RIBA Stages 4 to project completion | 17.5 | cost | — |
| Total of the Hourly and daily rates | 5 | cost | — |
Submission & procedure
- Procedure
- Award procedure without prior publication of a call for competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—