Urban Realm - Civils, Earthworks, Utilities infrastructure and associated structures WP13.1 - Old Oak Common (S4) Station
Estimated value
£20.0m
Awarded value
—
Suppliers
1
Lots
1
Published
08 Jul 2024
Description
Scope of Works: The station is the London interchange station of the UK's second high-speed railway. It will be located on the site of the now demolished Old Oak Common Railway Depot, bounded by the Crossrail Depot to the north, the London Overground West London line to the east, the Intercity Express Programme Depot to the south and Old Oak Common Lane to the west. HS2, Great Western Main Line (GWML), Crossrail and Heathrow Express services will be served by the new Old Oak Common Station. HS2 Old Oak Common Station will provide a state-of-the-art gateway to London and the wider area, with efficient intermodal interchange with rail, taxi, cycle and pedestrian modes. Urban Realm packages involve all the outside space aside any building structures, spanning over an area of approximately 50000m2. BBVS is seeking to contract under NEC3 Option A with a contractor to deliver the first sub package of works that includes the following elements in summary: Normal and lightweight fill earthworks (more than 75k m3), and associated reinforced concrete retaining structures Excavation works and reinforced concrete structure for DNO housing building Boundary fences and associated foundation pads & retaining walls, inclusive of earth bonds. Underground reinforced concrete attenuation tanks Overground reinforced concrete attenuation tanks Reinforced concrete foundation slabs for cycle hub, catering building and water gardens Deep & surface water drainage, fire hydrant network, water networks, LV/HV/ other ducting & other associated infrastructure such as utilities access chambers The scope of the subcontract includes but not limited to: The provision of all necessary People, Equipment, Plant & Materials (temporary or permanent) to deliver RIBA 5 Design, mock-ups, temporary works, fabrication, installation, & certification of the associated works The Subcontractor will need to demonstrate that they have the capabilities & resources to deliver the size and nature of this project in a rail environment. The Subcontractor will be required to produce & submit 2D/3D designs in native DGN files, working on projectwise and other software platforms. The Subcontractor will be required to liaise with organisations such as Transport for London, Crossrail Depot, Network Rail & Thames Water. Webinar For further information and visuals, please watch our BBVS Webinar recording on the whole Urban Realm activities: https://attendee.gotowebinar.com/recording/4015116724636723457 Please note, all information included within the presentation is indicative and is for information purposes only. Also, please note the procurement slides are subject to revision. Programme It is currently anticipated that the site works will be predominantly completed between Q3 2024 and Q4 2027, with a preconstruction period prior to site activities.
Scope
- Reference
- C4A69033942
- Total value
- £20,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 15 Aug 2024 to 31 Jan 2028
- CPV classifications
- 45000000 71311100
Submission & procedure
- Submission deadline
- 13 Mar 2023, 9:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
03 Jul 2024
Contract start
15 Aug 2024
Contract end
31 Jan 2028
Awarded suppliers· 1 supplier
Awarded 03 Jul 2024 · Contract period 15 Aug 2024 — 31 Jan 2028
Other contracts from BIP SOLUTIONS LIMITED
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to Kilnbridge Construction Services Ltd· 6
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Fit Out - WP12.2.2 - WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station | call off | — | 15 Jan 2025 |
| Wider Ecosystem | contract | — | 25 Oct 2024 |
| BBV HS2 MWCC North - SD & RW - Ancillary tasks (coring, sawcutting, hydrodemolition) | call off | £99k | 24 Nov 2022 |
| EKFB JV - Pile Cap Cropping | call off | £21k | 09 Sept 2021 |
| WP0100- Demolition and Alterations incl Vestibule | contract | £2.3m | 31 Mar 2019 |
| SWIP ASPIRE LOT 1 Civils - VB2 | contract | £2.0m | 08 Aug 2016 |