Bournemouth Pier Structural Works
Estimated value
£8.8m
Awarded value
—
Suppliers
0
Lots
1
Published
20 Jan 2025
Description
The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn't affordable then Option A. Suppliers can bid to any or all of the 3 options. The specifications which outline the requirements for this contract are contained with the following document 'Bournemouth Pier Structural Works - Document Schedule 16.01.2025' The successful Bidder will be expected to commence the works in May 2025 and will be required to ensure the works are completed by December 2026 (not including defects period).
Scope
- Reference
- BOURN001-DN755872-14630995
- Total value
- £8,750,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 31 Mar 2026 to 31 Dec 2027
- CPV classifications
- 45220000 45223000 45223500 45241300 45262330 45243300
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 30 Jul 2025, 1:00 pm