Fit- out C4 -KCSL
Estimated value
£100k
Awarded value
—
Suppliers
0
Lots
1
Published
13 Mar 2025
Description
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for Fit-Out of the Portal and Ancillary Buildings. Those buildings include the following: • South Portal • DNO Substation • West Core • East Core • North Portal • Train Crew & Catering Building • Cycle Hub • Security Booth The package includes a range of Multiple services: • Painting & decorating (Soffits, walls, floors) • FF&E of Offices • kitchenettes cupboards • Sanitaryware • IPS units • Ceilings • Tiling walls • Flooring finishes • Screed The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for manufacture, supply and testing (if req'd). The Subsubcontractor will be responsible for progressing the schedule and associated detailed drawings for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. Expected Subsubcontract award TBC Construction is to be carried out over a 2.5-year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Scope
- Reference
- C4N91510672
- Total value
- £100,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 25 Jan 2026 to 29 Jun 2028
- CPV classifications
- 44115000 44523300
Submission & procedure
- Submission deadline
- 20 Mar 2025, 5:00 pm