ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
21 Feb 2025
Description
Design and Build of Work re. Incinerator Kiln Refractory Lining replacement for the Primary and Secondary Combustion Chambers. The scope of works will involve: • Detailed design and configuration of the new refractory lining and anchors based on the existing plant, drawings and documentation. • Supply and delivery of all refractory materials and anchors including any materials used for forming, moulding, and support structure (e.g. wood, polystyrene) and 1 tonne waste bags with sealable tops. • Deconstruction of existing refractory lining and Anchors (Disposal of waste by others) • Installation of the new anchors and refractory lining as per agreed detailed design. • Management of drying out and curing of the lining. • Management of all subcontractors employed by the supplier to complete these works. • Submission of O&M containing all required details as per PIF and separate section to provide information needed for the Health and Safety File. Please see Contract Scope section in ITT document.
Scope
- Reference
- BC22-004
- Commercial tool
- Standalone contract
- Contract dates
- 19 Nov 2024 to 31 Dec 2025
- Main category
- goods
- CPV classifications
- 4419200045000000511351107131000071320000
- Contract locations
- West Sussex
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Technical/Quality Aspects | 50 | quality | — |
| Price | 30 | cost | — |
| Other Commercial Aspects | 20 | cost | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—