Central Substation RIBA4 & Build
Estimated value
£1.3m
Awarded value
—
Suppliers
0
Lots
1
Published
25 Feb 2026
Description
The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.
Scope
- Reference
- 20260225110022-153032
- Total value
- £1,300,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 28 Mar 2026 to 29 Mar 2026
- CPV classifications
- 45000000 45100000 45200000 45300000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 27 Mar 2026, 3:00 pm