Central Substation RIBA4 & Build

KBS Maritime LtdcontractContracts FinderRef 20260225110022-153032SME suitableclosed
View buyer

Estimated value

£1.3m

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

25 Feb 2026

Deadline 27 Mar 2026

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Scope

Reference
20260225110022-153032
Total value
£1,300,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
28 Mar 2026 to 29 Mar 2026
CPV classifications
45000000 45100000 45200000 45300000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
27 Mar 2026, 3:00 pm