Supertram Embedded Rail Replacement Phase 2
Estimated value
£12.5m
Awarded value
£9.3m
Suppliers
1
Lots
1
Published
23 Apr 2018
Description
The Executive is the owner of the Supertram system. South Yorkshire Supertram Limited (SYSL) (a subsidiary of Stagecoach), operate the Supertram network, and maintain the majority of the asset for the Executive, under a Concession terminated in 2024. The wear of the embedded rails had reached a condition on certain lengths of the network where it required replacement to prevent the flange of the tram wheels running on the bottom of the rail groove. Accordingly between 2013 and 2015, approximately 15km of embedded rail was replaced. It is proposed to complete the remaining 10km of replacement over the summers of 2018, 2019 and 2020. The works comprise the replacement of the remaining sections of embedded rail on certain sections of the Sheffield Supertram Network where wear has reached a critical condition. The Executive and South Yorkshire Supertram Limited need to ensure the system remains operable and in order to achieve this, the embedded rails need to be replaced. The works are programmed to run between May 2018 and August 2020.
Scope
- Reference
- 2734
- Total value
- £12,500,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Sept 2018 to 01 Dec 2020
- CPV classifications
- 45234116 45234121
Submission & procedure
- Submission deadline
- 08 Dec 2017, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£9.3m
Award date
18 Apr 2018
Contract start
30 Sept 2018
Contract end
01 Dec 2020