Supply of Auxiliary Steam Boiler System copy
Estimated value
£20.0m
Awarded value
—
Suppliers
0
Lots
1
Published
20 Nov 2024
Description
Sizewell C Limited (SZC) is undertaking to design and build an EPR Nuclear Power Station at Sizewell C, Suffolk, United Kingdom. As part of this project there is a requirement to procure the design, supply and on-site supervision of the installation and commissioning of auxiliary equipment including boilers, pumps, vessels and associated control system. The supplier will be appointed to develop a solution for the 'XCA System' to be housed in the site's Boiler (HVB) Building, that will deliver to the high level specification described in the 'background information' attached to this Opportunity. SZC intends to place the contract for this by the end of Q4 2025, to design and supply these works ready for commencement of works on site currently estimated to be between 2030-2034. SZC welcomes interest for all or part of the above works, along with proposals for procurement with nominated or JV partners and the like.
Scope
- Reference
- C4N87724304
- Total value
- £20,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 01 Mar 2026 to 01 Mar 2034
- CPV classifications
- 42164000 44621200 42162000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 29 Nov 2024, 4:00 pm