HW05661 - UPPER DON FLOOD ALLEVIATION SCHEME (FAS) - PHASE 1 LOXLEY CONFLUENCE
Estimated value
£7.7m
Awarded value
£7.7m
Suppliers
1
Lots
1
Published
26 Feb 2020
Description
The project is the design and construction of linear flood defences along both banks of the river Loxley from Malin bridge to the confluence of the rivers Loxley and Don. The site is generally split into three locations: Holme Lane Defences, Penistone Road Defences and Loxley Confluence Defences. The defences will consist of a combination of new structures and modifications to existing structures and buildings and may include the following: retaining walls, retaining walls with mini-piles, gravity walls, raising and/or strengthening existing walls, ground raising and embankments, bridge parapets, flap valves and flood gates.
Scope
- Reference
- SHEFCC001-DN433635-49124687
- Total value
- £7,743,498 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 31 Mar 2020 to 28 Oct 2021
- CPV classifications
- 45246410 45246400
Submission & procedure
- Submission deadline
- 12 Nov 2019, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£7.7m
Award date
25 Feb 2020
Contract start
31 Mar 2020
Contract end
28 Oct 2021