Ynysarwed Mine Water Treatment Scheme upgrade to High Density Sludge Treatment Plant Design and Build
Estimated value
£4.7m
Awarded value
£4.7m
Suppliers
1
Lots
1
Published
28 Feb 2022
Description
Specialist contractor to undertake the design, construction and commissioning of a new high-density sludge treatment plant and decommissioning of the existing treatment plant. • The project objectives; • Replace the existing Treatment Plant with a High Density Sludge (HDS) plant; • Improve the scheme from an operational, environmental and health and safety perspective; • Improve the longevity and resilience of the scheme; • Provide efficiencies with improved chemical dosing and other controls; • Reduce operational costs; • Assess, record and reduce the carbon emissions associated with the life of the scheme; • Identify cost efficiencies; • Reduce risk of pollution of the River Neath and the Neath Canal; • Comply with the existing discharge consents; • Minimise the downtime of the existing scheme during construction; • Develop plans for the assessment, measurement, and continual improvement of waste management, sustainability and carbon impact for the construction, operation and decommissioning of the scheme.
Scope
- Reference
- CA18/4973
- Total value
- £4,688,222 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 23 Dec 2021 to 29 Jul 2023
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 17 Sept 2021, 3:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£4.7m
Award date
26 Nov 2021
Contract start
23 Dec 2021
Contract end
29 Jul 2023