Non-Infrastructure Medium Project Work
Estimated value
—
Awarded value
—
Suppliers
22
Lots
3
Published
16 May 2024
Description
Non-infrastructure MEICA and Civils ~ Medium (RW1) Project Work. TWUL are procuring delivery capability for Non-Infrastructure projects. TWUL recognises non-infrastructure as nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water's water and wastewater non-infrastructure (treatment) assets across the Thames Water region. The Non-infrastructure scope includes refurbishment, replacement and provision of new potable water and wastewater treatment assets including service and storage reservoirs Water non infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, - disinfection, - surge protection, - chemical dosing, - supervisory control and data acquisition (SCADA), - run-to-waste facilities, - cartridge filters and UV, - increased power resilience, - inspection and maintenance of existing service and storage reservoirs. Wastewater non-infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new treatment facilities such as inlet works, - storm water storage, - event duration monitors, - settlement tanks, - biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), - digester roof replacement, - combined heat and power (CHP), - chemical dosing, - phosphorous removal, - odour control, - SCADA, - increased power resilience. two.1.5) Estimated total valueII.1.5) Estimated total value Value excluding VAT: £500,000,000 two.1.6) Information about lotsII.1.6) Information about lots This contract is divided into lots: Yes Tenders may be submitted for one lot only
Scope
- Reference
- FA1756
- Commercial tool
- Standalone contract
- Contract dates
This lot shall run for an initial period of 4 years. Subject to satisfactory ongoing performance, the Contracting Entity reserves the right to extend this lot for up to a maximum further 4 years.
- Main category
- works
- CPV classifications
- 453100004535100045232421452324224523242345232430452324314523244045232450452324514523245345350000
- Contract locations
- LondonSouth East England
Submission & procedure
- Procedure
- Negotiated procedure with prior call for competition
Award details· 23 awards
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 3 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Non-infrastructure MEICA Medium Project Works | £167.0m | cancelled |
| 2 | Civil Medium Project Work | £167.0m | cancelled |
| 3 | Projects involving both MEICA and Civils Works | — | cancelled |