Modification Works to Building 68A (Facade Test Structure) at HSE Laboratory in Buxton
Estimated value
—
Awarded value
£46k
Suppliers
1
Lots
1
Published
24 Jun 2025
Description
HSE have a requirement to re-purpose an existing structure onsite for use as a façade fire test facility. The structure will be used for experimental projects studying fire spread over the external walls of buildings. Any type of façade construction may need to be tested and so the system has been designed to allow for this. The work required to achieve the objectives of this work, is to install a series of steel beams on to which standard sized fireboards can be attached. The works are required at our Buxton site SK17 9JN
Scope
- Reference
- HSE/T4755
- Commercial tool
- Standalone contract
- Contract dates
- 11 May 2025 to 01 Aug 2025
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£46k
Award date
12 Jun 2025
Contract start
29 Jun 2025
Contract end
26 Sept 2025
Awarded suppliers· 1 supplier
Awarded 12 Jun 2025 · Contract period 29 Jun 2025 — 26 Sept 2025
Other contracts from Health and Safety Executive
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to BUILD 4 GROWTH LTD· 6
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Eastwood Village Primary - Waterproofing Works | contract | — | 07 Jul 2026 |
| Project Work at Richmond Swimming Pool on behalf of Richmondshire District Council | contract | £1.5m | 05 Jul 2022 |
| Refurbishment of toilets | call off | £26k | 22 Apr 2021 |
| 2237/JR UoS Goodwin Sports Centre Access Works | call off | £93k | 13 May 2019 |
| 17-009 Albert Street Flats, Masbrough, Rotherham Metal work and Fencing Environmental Improvements | contract | £100k | 14 Nov 2017 |
| Replace existing rooftop plant room enclosure at Chemical Engineering Building | call off | £69k | 24 Oct 2017 |