Primary Spring Chevrons - 09 HOPL (Victoria Line)
Estimated value
—
Awarded value
£519k
Suppliers
1
Lots
1
Published
19 Jan 2026
Description
This direct award procurement is for the supply of the bogie Primary Spring Chevrons for the Victoria Line fleet. The primary suspension chevrons are Metalastik units made up of metal plates bonded with a moulded rubber layer. This rubber serves a dual purpose: it acts as a spring while also providing damping, and it allows limited movement so the wheelset can make small rotations in all directions. The programme is phase 2 of the of the Victoria Line Heavy Overhaul programme. This phase will commence in October 2026. The Chevrons will be fitted to the Bogies at Depot with a 100% mandatory swap out of 128 Chevron per train. 46 trains will be overhauled in total. The train overhaul is being undertaken by TFL engineering team.
Scope
- Reference
- WS2839371013
- Commercial tool
- Standalone contract
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Procedure
- Direct award
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£519k
Award date
—
Contract start
01 Mar 2026
Contract end
28 Feb 2027