NAC/5078 Ardrossan Marina Extension Engineering Consultancy
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
26 Apr 2022
Description
North Ayrshire Council require a consultant to develop the previous concept design to full detailed design. This requires the design of two offshore breakwaters, tying into the adjacent pier and revetment, and basin depth/profiles to be established which will enable a minimum 130-berth capacity marina with subsequent fit out of piers/pontoons etc. The design will include value engineering and innovative methods to achieve a cost effective and low carbon solution. A low carbon solution will be considered in line with the Scottish Government Net Zero Carbon objective. This contract award will be based on the tender submission for the full package of detailed design services as outlined. NAC only commit to services detailed in Stage 1 Preliminary Design with further stages undertaken only after satisfactory review of the initial construction cost estimate.
Scope
- Reference
- ocds-h6vhtk-02fb78
- Commercial tool
- Standalone contract
- Contract dates
Optional extension of up to 3 months
- Main category
- services
- Contract locations
- Scotland
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality | 40 | quality | — |
| — | 60 | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—