BBV Sublot 4 - HSST1020 - Saltley Traffic Signals
Estimated value
£150k
Awarded value
—
Suppliers
0
Lots
1
0 awarded
Published
12 May 2025
Deadline 16 May 2025
Description
A Subcontractor is required to undertake the installation of traffic signals within the Saltley Section of Sublot 4. There are two pedestrian crossings to be provided, one at each highway bridge (Aston Church Road Overbridge and Saltley Viaduct). The package will be to provide labour, plant and materials for the installation of the traffic signals. Package includes the installation of posts, heads, loops, cables and cabinets. All ductwork and sockets will be installed by others.
Scope
- Reference
- C4N93928491
- Total value
- £150,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 31 Aug 2025 to 15 Oct 2026
- CPV classifications
- 34996100 34923000 34992100 45316211 45316212
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 16 May 2025, 4:00 pm