Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JVcontractContracts FinderRef C4N81862276SME suitableclosed
View buyer

Estimated value

£500k

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

31 Oct 2025

Deadline 28 Feb 2026

Description

WP12.10 Statutory and Wayshowing Signage Scope of work: WP12.10 Statutory and Wayshowing Signage consists of the design for construction and manufacture, supply, installation and assurance of signage to HS2 Station areas, the Conventional Station and Shared Accommodation Building (SAB). The scope of this package includes the following: • Locations: (i) Conventional Station including Platforms 1 to 8, the East & West Escape Cores; (ii) Shared Accommodation Building (SAB) Basement, Ground, First & Second Floors; (iii) HS2 Station including Platforms 9 to 14 and the East, West Central Cores; and (iv) Ancillary Buildings, including North and South Portals. • Elements: Statutory and Wayshowing signage as below: (i) Fire safety signage (escape signage & fire cabinet signage) covering FOH and BOH areas; (ii) Conventional Station overhead Line Wires (OLE) warning signage; (iii) Wayshowing signage covering FOH areas, BOH areas; (iv) Ancillary Buildings statutory signage including fire exit and wayfinding; and (v) Other statutory signage including door signage. • Design Development: Prepare the design for Construction and Manufacture, including detailed plans, typical elevations, general arrangements, and signage schedule. These drawings should encompass all necessary interface and connection details, ancillary elements and products to meet the prescribed performance requirements. • Samples and Prototypes: Provide samples as deemed necessary to ensure compliance with design intent and quality standards. • Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design. • Assurance and Certification: Generate and supply comprehensive assurance documentation. • Coordination: Ensure coordination with various substrates, and other finishes to achieve integration within the overall project. About the buyer's selection process: Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment). About the buyer: In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common. BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.

Scope

Reference
C4N81862276
Total value
£500,000 excluding VAT
Commercial tool
Standalone contract
Contract dates
08 Nov 2027 to 11 Nov 2031
CPV classifications
31523000 31523200 34928470
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
28 Feb 2026, 12:00 pm