MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 2 (Sheepway and Old Station Road Bridges)
Estimated value
£1.5m
Awarded value
£1.5m
Suppliers
1
Lots
1
Published
07 May 2026
Description
North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project. The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhancements to the local rail network. The highway and bridge works comprise of two works packages. Package 1 is the highways scope which includes detailed design (stage 1) and construction (stage 2). Package 2 is the bridges scope which includes stage 2 construction only (covered by 3 separate contracts). This notice relates to the award of the Stage 2 Package 2 Bridges construction contract 2 of 3 (Sheepway Bridge and Old Station Road Bridge)
Scope
- Reference
- NSOMS001-DN691619-36049346
- Total value
- £1,475,605 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 10 Mar 2026 to 27 Jan 2027
- CPV classifications
- 45233100 45233120 45221100 45221110 45221111 45221112 71322300
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 13 Dec 2023, 1:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.5m
Award date
09 Mar 2026
Contract start
10 Mar 2026
Contract end
27 Jan 2027