3rd Line Support for the Maintenance of the London Overground WestCAD & SSI Interlocking
Estimated value
—
Awarded value
£135k
Suppliers
1
Lots
1
Published
24 Apr 2025
Description
This is a single source for the Third line support and maintenance contract for the WestCAD signalling control and display system (SCDS) and the Solid-State Interlocking (SSI) which were developed by and installed by Siemens Mobility Limited for signalling control on the London Overground Core Windrush Line (formerly East London Line). The contract will end on the 31st July 2026. This contract undertakes 3rd line support should faults not be rectified locally across the line. Siemens provide a 24/7 diagnostic hotline, all operational spares, escalation of fault to expert if unable to resolve and the availability of system experts in hardware/software. This is estimated to cost during this period is £135,000 (excluding VAT).
Scope
- Reference
- WS2371076555
- Commercial tool
- Standalone contract
Submission & procedure
- Procedure
- Below threshold - without competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£135k
Award date
—
Contract start
23 Apr 2025
Contract end
31 Jul 2026