Area 3 Asset Support Contract Awarded
Estimated value
£120.0m
Awarded value
£120.0m
Suppliers
1
Lots
1
Published
18 Nov 2019
Description
Routes for Roads Maintenance, Renewal and Improvement elements, and Technology Renewal and Improvement elements: A3 from a point approx. 2km south of M25 at Ockham I/C (Surrey) south to its junction with the A3(M) (Hampshire) including operation and maintenance of the twin bore Hindhead tunnel. M3 from a point approx. 2km south of M25 at Kitsmead Bridge (Surrey) south to its junction with the M27 (Hampshire). A3(M) in its entirety (Hampshire). A303 from its junction with M3 Junction 8 (Hampshire) west to its junction with the A338 (Hampshire/Wiltshire boundary line). M4 from Junction 5 (Berkshire) to M4 Junction 15 (Wiltshire). A404(M) from M4 Junction 8/9 to A404 (Berkshire). A404 from A404(M) (Berkshire) to M40 Junction 4 (Buckinghamshire). A308(M) from M4 Junction 8/9 to A308 (Berkshire). A34 from M3 Junction 9 (Hampshire) to M40 Junction 9 (Oxfordshire). M27 from Junction 1/A31 Cadnam, Hampshire to A27 Hilsea, east of Junction 12, Portsmouth (incl. slips to M275 - Tipner Bridge). M271 from Junction A3057 Romsey Road Rdbt, Hampshire (north of M27) to Redbridge Rdbt, Southampton (south of M27). A27 from M27 Hilsea (east of the M275 link to Portsmouth) to A259 Junction Warblington, Hampshire. A31 (Hants) from M27 Junction 1/A31 Cadnam, Hampshire to Kins Stream Bridge (west of Ringwood, A338 Ashley Heath Junction). A31 (Dorset) from Kings Stream Bridge (west of Ringwood, east of A338 Ashley Heath Junction) to A35/A31 Junction Bere Regis, Dorset. There is potential for parts of the network to be passed to the neighbouring HA area commissions/Local Authorities during the lifetime of the Contract. Co-location with, facilities for and supervision/management of the Highways Agency Regional Technology Maintenance Contract (RTMC)for the South East in Areas 3 and 4. The RTMC (SE) Network in Areas 3 and 4 is listed below: Area 3 A3 from a point approx. 2km south of M25 at Ockham I/C (Surrey) south to its junction with the A3(M) (Hampshire) including operation and maintenance of the twin bore Hindhead tunnel. M3 from a point approx. 2km south of M25 at Kitsmead Bridge (Surrey) south to its junction with the M27 (Hampshire). A3(M) in its entirety (Hampshire). A303 from its junction with M3 Junction 8 (Hampshire) west to its junction with the A338 (Hampshire/Wiltshire boundary line). A34 route within Hampshire boundary only. M27 from Junction 1/A31 Cadnam, Hampshire to A27 Hilsea, east of Junction 12, Portsmouth (incl. slips to M275 - Tipner Bridge). M271 from Junction A3057 Romsey Road Rdbt, Hampshire (north of M27) to Redbridge rdbt, Southampton (south of M27. A27 from M27 Hilsea (east of the M275 link to Portsmouth) to A259 Junction Warblington, Hampshire. A31 (Hants) from M27 Junction 1/A31 Cadnam, Hampshire to Kins Stream Bridge (west of Ringwood, east of A338 Ashley Heath Junction). There is potential for parts of the network to be passed to neighbouring HA Area commissions/Local Authorities during the lifetime of the contract. Routes that are covered
Scope
- Reference
- tender_224259/813225
- Total value
- £120,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 01 Nov 2013 to 30 Oct 2021
- CPV classifications
- 45233139
Submission & procedure
- Submission deadline
- 29 May 2012, 11:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£120.0m
Award date
10 Jun 2013
Contract start
01 Nov 2013
Contract end
30 Oct 2021