Ventilation Adaptations, CO2 Monitoring, and Heat Recovery Works
Estimated value
£30k
Awarded value
£30k
Suppliers
1
Lots
1
Published
25 May 2021
Description
Ventilation Adaptations, CO2 Monitoring, and Heat Recovery Works at 2 Piccadilly Place. The works include the following activities: - Install CO2, temperature, and humidity sensors on all floors (2 per floor). - Supply and install new galvanised ductwork link from exhaust to supply AHU. - Supply and install new damper actuators and additional wiring as required. - Thermal insulate ductwork. - Commission Ventilation and set minimum fresh air. - Commission controls. - All required BMS controls and configuration interfacing including pre and after back-up programme to be provided to TfGM. - Supply an as installed /as built health and safety file both hard and electronic copies. - TfGM Staff training at 2 Piccadilly Place.
Scope
- Reference
- GMPTE001-DN533728-04381523
- Total value
- £30,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 11 Apr 2021 to 29 Jun 2021
- CPV classifications
- 45000000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 02 Apr 2021, 11:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£30k
Award date
13 May 2021
Contract start
11 Apr 2021
Contract end
29 Jun 2021