Kingsway Tunnel Refurbishment (Dado Panels)
Estimated value
£4.8m
Awarded value
—
Suppliers
0
Lots
1
Published
12 Jun 2026
Description
The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.
Scope
- Reference
- DN818709
- Total value
- £4,800,000 excluding VAT£6,000,000 including VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 06 Nov 2026 to 05 Nov 2028
- Main category
- works
- CPV classifications
- 45262660
- Contract locations
- North West England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality 60% | — | quality | 60.00% |
| Price | — | price | 30.00% |
| Social Value | — | quality | 10.00% |
Participation
Conditions suppliers must meet to bid.
Initial stage PPQ for Legal/Financial Conditions of Participation.
Mandatory technical criteria inserted in tender documentation.
Submission & procedure
- Enquiry deadline
- 29 Jun 2026, 11:00 am
- Submission deadline
- 07 Jul 2026, 11:00 am
- Submission address
- https://procontract.due-north.com/SupplierRegistration/Register ↗
- Electronic submission
- Yes
- Procedure
- Competitive flexible procedure