Manchester Airport Terminal 2 Reconfiguration & Pier 2 Phase 2 TP3856 Wall Lining and Ceiling Systems
Estimated value
£6.5m
Awarded value
—
Suppliers
0
Lots
1
Published
16 Feb 2023
Description
MAG shall appoint a single suitably qualified and experienced Wall Lining and Ceiling System Contractor to provide works and services for Terminal 2 Reconfiguration. The procurement strategy is to issue a complete RIBA Stage 4 design at tender stage under a proposed NEC4 ECC Option A Contract. There will be a requirement for the successful contractor to also provide Wall Lining and Ceiling Systems Services for the Pier 2:Phase 2 Project for a combined value of 6.5m. The Scope deliverables including but not limited to the supply and installation of the following: Feature Plasterboard Bulkheads Column Encasements Glazed Screens (Including Manifest Stations) IPS Cubicles Feature Walls and Ceilings System Ceilings Pilasters Wall Protection (Chequer Plate) Perimeter Heating Covers Metal Flashing and Trims MAG reserve the right to amend the scope, which is to be communicated within the ITN.
Scope
- Reference
- TP3856
- Total value
- £6,500,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 22 Aug 2023 to —
- Main category
- works
- Contract locations
- North West England
Submission & procedure
- Submission deadline
- 13 Mar 2023, 1:00 pm
- Submission address
- https://mag.medius-s2c.com/S2C/SignIn.aspx ↗
- Procedure
- Competitive procedure with negotiation