Description
The current Fuel Line located in National Nuclear Laboratory’s (NNL’s) Central Laboratory was designed and installed in the mid-2000’s in Area 400 to provide research and development (R&D) support to Sellafield Mixed Oxide (MOx) Plant (SMP), which utilised the Short Binderless Route (SBR) for producing MOx. However, the Fuel Line was never fully commissioned and has remained in a state of Care and Maintenance (C&M) since then. The intent is to re-purpose the above existing fuel line, whilst keeping certain elements embedded within the design. The scope of the works required is therefore to Design, Install and provide technical support to Commissioning for the Fuel Line for future usage by the NDA
Scope
- Reference
- NNLC123
- Total value
- £30,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Apr 2023 to —
- Main category
- works
- CPV classifications
- 09340000452511104530000071300000713210007132320071350000
- Contract locations
- North West England
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| — | — | price | — |
Submission & procedure
- Submission deadline
- 15 Aug 2022, 4:00 pm
- Submission address
- https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=15645&B=SELLAFIELD ↗
- Procedure
- Restricted procedure