Stubbin Wood, Burlington Avenue, New Primary Development (60 places)

T.E.A.M EDUCATION TRUSTcontractFind a TenderRef ocds-h6vhtk-04fdb6Procurement Act 2023SME suitableclosed for bids
View buyer

Estimated value

£1.1m

works

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

04 Apr 2025

Deadline 02 May 2025

Description

The project involves the establishment of a 60-place primary school brick built unit at Stubbin Wood, Burlington Avenue, with an operational deadline of 1st September. This procurement aims to ensure the successful delivery of the facility by the specified date, which will meet the increasing demand for educational spaces in the area. Key Steps in the Procurement Process: 1. Needs Assessment and Specification Development: o Initially, a thorough assessment of the educational and spatial requirements for the 60-place primary unit will be conducted. This involves consultations with local education authorities, stakeholders, and future users to understand the specific needs. o A comprehensive specification will be developed, including detailed requirements for the building structure, classrooms, play areas, utilities, and additional services such as accessibility, safety standards, and sustainable energy solutions. 2. Supplier and Contractor Identification: o The procurement will follow a competitive tendering process to select qualified suppliers and contractors capable of delivering the project within the required timeframe and budget. o Pre-qualification criteria will be established, considering experience in educational infrastructure projects, financial stability, and adherence to relevant local regulations and standards. o Invitations to tender (ITT) will be issued to shortlisted contractors and suppliers. 3. Tender Evaluation and Award: o Tenders will be evaluated based on criteria such as quality, cost-effectiveness, timeline, and contractor's experience with similar projects. Special consideration will be given to the contractor's ability to deliver the project by 1st September, ensuring the school is operational at the start of the academic year. o After a thorough evaluation, the most suitable contractor will be awarded the contract. 4. Construction and Project Management: o Once the contract is awarded, the construction phase will commence. A project management team will be assigned to oversee the progress of the development, ensuring that all aspects of the project are delivered on schedule, within budget, and meet the specified quality standards. o Regular progress meetings will be held to monitor construction milestones, address potential challenges, and ensure smooth communication between the contractor, stakeholders, and the education authority. 5. Quality Control and Compliance: o Rigorous quality control measures will be implemented throughout the construction process to ensure that the building meets all relevant safety, health, and environmental standards. o The building will be subjected to inspections and tests to verify compliance with educational facility requirements and to ensure that it is fully functional and safe for students and staff. 6. Final Handover and Operational Setup: o Upon completion, the school unit will undergo a final inspection and handover process. This will include setting up necessary educational equipment, furniture, and ensuring that all utilities are fully operational. o The school will be handed over to the local education authority before 1st September to ensure a smooth transition and timely opening for the new academic year. 7. Post-Completion Review: o After the school is operational, a post-completion review will be conducted to assess the success of the procurement process and to identify any lessons learned for future projects. By following this procurement process, the project ensures that the 60-place primary unit is delivered on time, meets all quality standards, and fulfills the educational needs of the local community by the 1st of September.

Scope

Reference
ocds-h6vhtk-04fdb6
Total value
£1,050,000 excluding VAT
£1,260,000 including VAT
Above the relevant threshold
Commercial tool
Standalone contract
Contract dates
12 May 2025 to 31 Aug 2025
Main category
works
CPV classifications
45214000
Contract locations
UK, United Kingdom
Particular suitability
Small and medium-sized enterprises (SME)

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Requirementsquality
Project DeliveryProject must be completed by 31/08/2025quality
Communicationquality
Health and Safety/ Safeguardingquality
Value for moneyprice
Costscost

Participation

Conditions suppliers must meet to bid.

As detailed in our invitation to tended document the following should be considered 1. Legal Capacity • Company Registration: The bidder must provide proof of their legal registration as a company or business entity, such as a certificate of incorporation or equivalent document. • Good Standing: Bidders must demonstrate that they are in good legal standing, meaning they are not under liquidation, bankruptcy, or subject to ongoing legal disputes that might affect their ability to perform the contract. • Relevant Licenses: Bidders may need to show proof of the necessary professional licenses, permits, or approvals required to carry out the work or provide the goods/services being tendered for. • Compliance with Local Laws: The bidder should demonstrate compliance with applicable local laws and regulations, such as tax, labor, and environmental laws. • Non-Conviction Statement: A declaration stating that the bidder has not been convicted of any crimes (e.g., fraud, corruption) that would impair their ability to participate in the tender. 2. Financial Capacity • Audited Financial Statements: Bidders should submit their audited financial statements for the past 2-3 years to demonstrate financial stability. This can include balance sheets, income statements, and cash flow statements. • Financial Turnover Requirements: The tender may specify a minimum average annual turnover for the last few years (e.g., "Bidders must have a minimum annual turnover of $X million in the last three years") to ensure they have the financial strength to handle the contract. • Proof of Liquidity: The bidder might be required to demonstrate sufficient working capital or liquidity, such as a letter from a bank confirming the bidder's financial position or available credit lines. • Creditworthiness: Some tenders require bidders to submit credit ratings or letters from financial institutions to prove their creditworthiness. • Insurance: Bidders may need to provide evidence of relevant insurance coverage (e.g., public liability, professional indemnity, or workers' compensation insurance) to mitigate risks during the contract's execution. • Performance Bond or Guarantee: The contract may require bidders to provide a performance bond or guarantee, which acts as security in case they fail to meet the terms of the contract. 3. Other Requirements • Tax Compliance: Evidence that the bidder is up to date with all tax obligations, such as a tax clearance certificate. • Bank References: A reference letter from the bidder's bank confirming financial standing or providing details of their financial transactions, such as a letter of credit. • Litigation History: A declaration from the bidder regarding any past or current legal disputes or claims against them, which could affect their ability to perform the contract.

As detailed in our invitation to tended document the following should be considered 1. Relevant Experience • Past Project Experience: Bidders must provide details of previous contracts or projects of a similar nature, scope, and complexity to demonstrate their ability to deliver the required goods or services. This could include project descriptions, timelines, and client references. • Specific Expertise: The bidder must demonstrate expertise in the specific area required by the tender (e.g., construction, IT, engineering, etc.), highlighting any specialized skills or certifications. 2. Technical Qualifications • Qualified Personnel: Bidders must specify the qualifications, experience, and roles of key personnel who will be involved in the project. This includes engineers, project managers, technical experts, etc., and their relevant qualifications, certifications, and experience in similar projects. • Staffing Plan: A description of how the bidder intends to staff the project, including the number of employees, the roles and responsibilities of each, and any specialized skills needed for the contract. 3. Equipment and Resources • Availability of Equipment: Bidders may need to provide a list of key equipment, machinery, or technology required to complete the project, including details of ownership, leasing arrangements, or planned procurement. • Infrastructure: Evidence that the bidder has the necessary physical infrastructure, such as offices, warehouses, or other facilities, to support the project. • Technological Capacity: If the project involves specialized technology, the bidder should demonstrate their capability to deliver using up-to-date and relevant technologies (e.g., software tools, machinery, etc.). 4. Quality Assurance and Control • Quality Management System (QMS): Bidders should demonstrate the implementation of a quality management system (e.g., ISO 9001 certification, or other relevant quality standards) to ensure that the goods/services provided meet the required standards. • Compliance with Technical Standards: Bidders must demonstrate that their goods, services, or work processes comply with the relevant national or international technical standards, specifications, and regulatory requirements. 5. Technical Approach • Methodology and Work Plan: The bidder should outline their proposed methodology for carrying out the project, including the steps, processes, timelines, and how they intend to manage the project's execution. This can include risk management strategies, milestones, and deliverables. • Innovation and Solutions: If applicable, the bidder may describe any innovative approaches, technologies, or solutions they plan to use to enhance project outcomes, reduce costs, or improve efficiency. 6. Health, Safety, and Environmental Standards • Health and Safety Plan: Bidders must demonstrate their commitment to health and safety standards, particularly if the project involves construction, engineering, or other potentially hazardous work environments. This may include providing a health and safety management plan or certifications (e.g., ISO 45001). • Environmental Considerations: If the project has environmental implications, bidders should provide an environmental management plan or proof of compliance with relevant environmental regulations (e.g., ISO 14001). 7. Testing and Maintenance • Testing Capabilities: If applicable, the bidder should outline their ability to conduct testing or trials on the goods, services, or works being provided to ensure they meet the required specifications. • Maintenance and Support: For projects that require ongoing service or support after the delivery of the product or service (e.g., IT services, equipment maintenance), bidders should outline their plans for maintenance and after-sales support, including response times and service level agreements (SLAs). 8. Certifications and Accreditations • Industry Certifications: Bidders should provide evidence of any relevant industry certifications, accreditations, or memberships in professional organizations that demonstrate their expertise and adherence to recognized technical standards. • Compliance with Standards: If the tender involves specific technical or safety standards (e.g., EN standards, local building codes, industry-specific regulations), the bidder must demonstrate compliance with these standards. 9. Subcontracting and Partners • Use of Subcontractors: If the bidder intends to subcontract parts of the project, they should outline the areas of the project to be subcontracted, provide details of the subcontractors' qualifications, and demonstrate how they will manage subcontractor performance. • Partnering Arrangements: If the bidder plans to partner with other companies to fulfill the tender's requirements, they should describe the partnering arrangements, including roles, responsibilities, and how they intend to collaborate to achieve project success. 10. References and Testimonials • Client References: Bidders should provide references from previous clients that speak to their technical abilities and past project successes. This may include client contact details, project summaries, and testimonials.

Submission & procedure

Enquiry deadline
01 May 2025, 11:00 am
Submission deadline
02 May 2025, 8:00 am
Submission address
Submissions to to be submitted by email c.peach@teameducation.org or www.teameducation.org
Electronic submission
Yes
Procedure
Open procedure