Clacton Leisure Centre Oil Boiler Replacement and Installation of New Solar PV's
Estimated value
—
Awarded value
£1.3m
Suppliers
1
Lots
1
Published
02 Dec 2025
Description
Project Objective The project aims to replace the existing end-of-life oil boiler system at Clacton Leisure Centre with a modern, low-carbon heating solution and and Installation of New Solar PV's. This is part of Tendring District Council's broader decarbonisation strategy and is supported by a successful PSDS Phase 4 grant application. Scope of Works Please review the specifications for the proposed works. Key Considerations The project is time-sensitive due to the failure of one of the existing boilers and the requirement to draw down most of Salix funding within the 2025/26 financial year. All works must be completed and commissioned by April/May 2026 to meet grant conditions. The project must be delivered with minimal disruption to leisure centre operations.
Scope
- Reference
- EPP0206
- Commercial tool
- Standalone contract
- Contract dates
- 19 Dec 2025 to 30 Nov 2026
- CPV classifications
- 09330000421600004251111045212000
- Contract locations
- East of England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Commercial | — | price | 60.00% |
| Quality | — | quality | 35.00% |
| Social Value | — | quality | 5.00% |
Submission & procedure
- Procedure
- Below threshold - open competition
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.3m
Award date
02 Dec 2025
Contract start
19 Dec 2025
Contract end
30 Nov 2026