Traction Power & Earthing Upgrades - Phase 1 Works

GREATER MANCHESTER EDUCATION TRUSTcontractFind a TenderRef ocds-h6vhtk-058dc932014L0024active
View buyer

Estimated value

works

Awarded value

Suppliers

1

Lots

1

1 awarded

Published

26 Aug 2025

Description

TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.

Scope

Reference
DN745191
Commercial tool
Standalone contract
Main category
works
CPV classifications
45000000
Contract locations
UK

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Quality70quality
30price

Submission & procedure

Procedure
Open procedure

Award details

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

Award date

Contract start

Contract end