Fire Remedial Works

Mid Suffolk District CouncicontractFind a TenderRef ocds-h6vhtk-054f81Procurement Act 2023SME suitableVCSE suitablepending
View buyer

Estimated value

Awarded value

£10.0m

Awarded 23 Jan 2026

Suppliers

2

1 SME

Lots

2

2 awarded

Published

23 Jan 2026

Description

The contract requires the delivery of remedial passive fire system actions following Fire Risk Assessments and planned programmes of work for roof compartmentation works to properties owned and managed by Babergh District Council and Mid Suffolk District Council. The works required include but are not restricted to: • Passive fire system remedial works following Fire Risk Assessments • Passive fire system works reported on a reactive basis • Passive fire system works to include, but not limited to:Supply and install fire doors; Repair to fire doors; Fire collars and pillows; Sealing systems; Fire signage; Compartmentation; Loft hatches; Fire stopping; Electrical cupboards; Fire Dampers; Ironmongery repairs and replacement; Fire rated glazing • Planned programme roof compartmentation works

Scope

Reference
600/PR-10698
Commercial tool
Standalone contract
Contract dates
01 Apr 2026 to 31 Mar 2029
Possible extension to 31 Mar 2031

It is intended that the Contracts will commence in April 2026, and run for a period of three years with the option for renewal, as decided by BMSDC, for an extension of up to a further two years, subject to satisfactory reviews based upon performance and quality of service and delivery. The maximum duration of the Contracts is therefore five years.

CPV classifications
44221220
45000000
51700000
Particular suitability
Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)

Award criteria

Criteria the buyer will use to evaluate bids.

NameDescriptionTypeWeighting
Simple descriptionPrice - weighting 40% Technical Evaluation (Written Responses) 40% Technical Evaluation (Presented Response) 20% A Supplier can only be successful for one Lot. In the event that the same Supplier is top placed on both Lots at the conclusion of the evaluation process, the Lot priority stated within Document B1 will be taken into consideration.price

Participation

Conditions suppliers must meet to bid.

As defined within the tender documents.

Submission & procedure

Procedure
Competitive flexible procedure

Award details· 2 awards

Awarded supplier(s), contract period and value as published in the award notice.

Awarded value

£5.0m

Award date

23 Jan 2026

Contract start

31 Mar 2026

Contract end

31 Mar 2029

Awarded to
BG
CH SC114142

Lots · 2 total

Divisions of the contract. Each lot can be awarded separately.

View all →
LotTitleEst. valueStatus
LOT-0001Lot A £5.0mcomplete
LOT-0002Lot B £5.0mcomplete