Subsea Cable Tail Installation Equipment & Services
Estimated value
£705k
Awarded value
£156k
Suppliers
1
Lots
1
Published
07 Mar 2016
Description
Procurement of equipment to install four no. 33kV rated cable tails from the current dry mate connectors to the 4 developer berths at the Wave Hub offshore facility for the development and testing of wave energy devices, providing a well-defined and monitored site with electrical connection to the onshore UK electricity grid. It is intended to replace the current 11kV rated dry mate connectors with a 33kV rated in-line joint and to terminate the cables with half of a 33kV dry mate connector. Four 300m cable tails, each consisting of a double armoured three-core cable, are laid to the north east as a bundle section over a distance of 160m from the TDU. Workscope to supply equipment to replace the current dry mate connectors with an in-line joints and to terminate the cables with half of a dry mate connector along with testing of cables onshore. Complete supply scopes: 4 x in-line joint 4 x Dry mate connector Onshore cable testing services Cable abrasion protection Supply of Rock Bags
Scope
- Reference
- MT171210
- Total value
- £704,937 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 24 Feb 2016 to 17 May 2016
- CPV classifications
- 31321400 45232000 45252125 44322200
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 18 Jan 2016, 12:00 am
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£156k
Award date
24 Feb 2016
Contract start
24 Feb 2016
Contract end
17 May 2016
Awarded suppliers· 1 supplier
Awarded 24 Feb 2016 · Contract period 24 Feb 2016 — 17 May 2016