Ambergate training facility building & fabrication / welding workshop
Estimated value
£4.0m
Awarded value
—
Suppliers
0
Lots
1
Published
19 Mar 2026
Description
Welding and Facilities Buildings • Full refurbishment of a facilities building and surrounding area to facilitate a new training centre. • Full refurbishment of welding and fabrication workshop to bring it up to modern standards in line with current regulations. • New cladding • Upgrade of lifting equipment (overhead crane) • Mechanical, electrical, heating and ventilation systems upgrades • Introduction of controlled flammable gas facility • Internal modular office construction Fabrication Building • Removal of identified asbestos • Installation of new roof covering including insulation • External re-cladding • New windows and doors throughout • Partial internal strip out including concrete cutting to floor slab • Full internal refurbishment to mechanical, electrical, heating and ventilation systems • Refurbishment of existing welfare facilities • Resurfacing of surrounding areas including access roads and concrete slab
Scope
- Reference
- ocds-h6vhtk-066e8e
- Total value
- £4,000,000 excluding VAT£4,800,000 including VATAbove the relevant threshold
- Commercial tool
- Standalone contract
- Contract dates
- 30 Jun 2026 to 30 Apr 2027
- Main category
- works
- CPV classifications
- 4400000045000000
- Contract locations
- East Midlands, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Quality / Technical | To be outlined in the Pre-Qualification (PQQ) Document | quality | 30.00% |
| Commercial / Price | To be outlined in the Pre-Qualification (PQQ) Document | cost | 70.00% |
Participation
Conditions suppliers must meet to bid.
To be outlined in the Pre-Qualification (PQQ) Document
Submission & procedure
- Submission deadline
- 20 Apr 2026, 10:59 pm
- Submission address
- https://www.sap.com/products/spend-management/ariba-login.html ↗
- Electronic submission
- Yes
- Procedure
- Competitive flexible procedure