SUPPLY CHAIN NOTICE - Central Substation RIBA4 & Build
Estimated value
£1.3m
Awarded value
—
Suppliers
0
Lots
1
Published
19 Mar 2026
Description
The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: - WP 1: Survey and assessment work to facilitate the RIBA 4 design. - WP 2: RIBA 4 Technical Design incl. all temporary works designs. - WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: - WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete. Those that meet the criteria of this initial phase will be invited to participate in a final competition. Deadlines for expressions of interest are the 27th March. Any expressions received after this date will not be accepted.
Scope
- Reference
- tender_524385/1561308
- Total value
- £1,300,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Jun 2026 to 30 Jun 2027
- CPV classifications
- 45232220
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 01 Jan 1, 12:00 am