P25 PRAMS - Costain HRS02 Tunnel and Lineside M&E
Estimated value
£500k
Awarded value
—
Suppliers
0
Lots
1
Published
02 Dec 2025
Description
Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 25 PRAMS scope for contract HRS02 consists of PRAMS within the scope of the entire Open Route and Tunnel M&E HRS02 Scope, delivering and developing reports at multiple design stages inclusive of; - PRAMS Data for various systems to meet MTBS, MART and MTBF requirements - Reliability and Availability analysis of the Open Route sub LV distribution systems - Support PRAMS Data preparation feeding into the final SIL Report and Certificate (by others). All the innovation and design development must be accompanied with a rigorous approach to ensuring that the technical requirements are met. Including testing, where necessary. Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
Scope
- Reference
- C4N103514198
- Total value
- £500,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 30 Apr 2026 to 31 Dec 2028
- CPV classifications
- 90721800 66517300 71313410 90711100
Submission & procedure
- Submission deadline
- 16 Dec 2025, 12:00 pm