Refurbishment of Orchard Close Pavilion
Estimated value
£60k
Awarded value
—
Suppliers
0
Lots
1
Published
20 Jan 2021
Description
Changing Room Refurbishment CHANGING ROOMS A & B Isolate existing services, strip out To carefully remove any existing loose or damaged wall tiles Make good plaster work Supply & fit whiterock, up to 2400mm high, stuck to existing walls with welded joints. Jointing between Altro & whiterock To uplift existing flooring & make good Supply lay levelling compound Supply & fit new safety flooring cap & coved throughout To manufacture & reinstate new toilet cubicles in Compact Grade laminate 12.5mm, edges chamfered, polished ironmongery durable Satin Anodised Aluminium To supply, install & plumb in new wall hung wash h& basins fitted with push top, time flow taps fitted with a thermostatic controller & isolation valves Mount & plumb in new standard size toilet pans & low level cisterns with push button (Urinals in Male Area) Supply & install new showers Install new drinking fountain, soap & h& towel dispensers Supply & fit new 'bar' style wall heaters Supply back to boiler room timer including frost stat decorate using vinyl matt paint all remaining walls & exposed pipe work & doors make good any damages & general wear & tear to all walls supply only perimeter benches using 'Cantilever' support brackets in metal, powder coated to match. Seating slats manufactured from Polyrey Compact Solid Grade 'Sanitized Antibacterial' laminate 12.5mm. All edges machined, chamfered & polished supply only perimeter coat hook rails in Polyrey Compact Solid Grade 'Sanitized antibacterial' laminate 12.5mm. All edges machined, chamfered & polished Supply aluminium coat hoots LOBBY AREA REFURBISHMENT To uplift existing flooring & make good Supply lay levelling compound Supply & fit new safety flooring cap & coved throughout To decorate using vinyl matt paint all remaining walls & exposed pipe work & doors. To make good any damages & general wear & tear to all walls KITCHEN AREA REFURBISHMENT Remove existing cupboard units. Supply &install new base units To uplift existing flooring & make good Supply lay levelling compound Supply & fit new safety flooring cap & coved throughout To decorate using vinyl matt paint throughout remaining walls & exposed pipe work & doors. To make good any damages & general wear & tear to all walls NEW PROPOSED WC ROOM / AREA To construct new WC area within left h& changing room Partition part of changing room Install 2 New doorways & doors Supply & fit new toilet pan & wash hand & basin Connect into local drain To uplift existing flooring & make good Supply lay levelling compound Supply & fit new safety flooring cap & coved throughout To decorate using vinyl matt paint throughout remaining walls & exposed pipe work & doors. To make good any damages & general wear & tear to all walls Supply & install new light To be received by Clare Evans by email, clare.evans@houghtonregis.org.uk
Scope
- Reference
- HRTC03
- Total value
- £60,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 15 Feb 2021 to 30 Mar 2021
- CPV classifications
- 45300000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 02 Feb 2021, 12:00 am