Procurement of a replacement USBL system for marine operations.
Estimated value
—
goods
Awarded value
—
Suppliers
1
1 SME
Lots
1
1 awarded
Published
15 Dec 2025
Description
Minesto require a USBL system for offshore operations. The system is required for installing infrastructure on the seabed and for kite installation and recovery. The beacons will be placed on the launch and recovery system (LARS) frame which is lowered to the seabed by a crane. The system will operate in 80m of water depth and a high current environment.
Scope
- Reference
- 19945
- Commercial tool
- Standalone contract
- Main category
- goods
- Contract locations
- Wales
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Slant Range | 20 | quality | — |
| Quality and fulfilment of tender | 20 | quality | — |
| Lead Time | 20 | quality | — |
| Cost of USBL Transducer | 20 | cost | — |
| Cost and number of Beacons | 10 | cost | — |
| Cost of cable | 5 | cost | — |
| Cost of extras | 5 | cost | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Awarded to